Chesilton Road, Fulham (completion in 2020)
The brief for this top floor mezzanine apartment was to fit 2 bedrooms & en-suite, as well as full internal remodelling. The existing space was challenging to work with due to fixed steel posts and soil pipe arrangements. The project is ongoing with a completion date of Summer, 2020